MetalERG – Boiler and medical equipment factory

MetalERG – Boiler and medical equipment factory

Lokalization Oława
Period of implementation 2012 - 2013
Range Contract engineer and investor's supervision
Volume 24 600 m3
Usable area 2 356 m2
Land area 5 163 m2
Building area 2 221 m2
Description Buildings: three-aisle one-level production hall equipped with 4 gantries and two-level rest and refreshment and office section.

    Technical equipment:
  1. compressor room,
  2. energy terminal,
  3. potable water terminal,
  4. water systems,
  5. sewage systems,
  6. heating and energy systems,